Optibus
Optibus is a startup that develops public transportation and bus scheduling software using advanced optimization algorithms and machine learning to better run mass-transportation.
My role and ownership
Product Designer for Optibus On-Schedule & On-Time desktop apps (B2B). Collaborating with CEO, product managers and developers, in an agile environment.
The challenge
- Controllers needed immediate visibility into service disruptions across entire networks
- Transit planners needed to balance hundreds of constraints while optimizing for multiple objectives
Solution
- Designed priority-based alert system surfacing critical issues while filtering noise
- Created unified timeline showing vehicle, driver, and schedule status
- Built scenario comparison views enabling planners to evaluate trade-offs
Optibus On-Time
A real time solution that empowers public transportation operators to address problems that trigger bus delays, before they impact passengers.


On-Schedule — Adding Features
On-Schedule is a vehicle and crew planning and scheduling for better operation and lower costs.


Rostering Feature
Rostering is the final step of the scheduling process, combining daily driver duties to create weekly "packages" of daily driver duties. Requirement: Adding Rostering feature (based on the Gantt view) in order to minimize labor costs while maintaining high driver satisfaction. Increase efficiency for crew and vehicle scheduling.